(UPDATE) Scheduled maintenance Transport (NCTS)

Unfortunately, the Transport (NCTS) rollout is extending even further than the estimated time of 7 p.m.
Expected end time is now 9pm.
Apologies for this.

Previous message:

-----------------------

The process Transport (NCTS) is unavailable from Saturday 24-09-2022 10:00.
Scheduled maintenance: You can deliver messages as usual, these will not be processed but buffered during the maintenance. After completion of the maintenance, the messages will still be processed and possible return messages will follow.

You are allowed to use the fall-back procedure. However: it is our advice to use the mentioned procedure only if, to your opinion, the logistic process needs treatment of declarations.