6623 results in disruptions and maintenance
-
Transport (NCTS) is available (again)
28-09-2020 -The process Transport (NCTS) is available (again) from Monday 28-09-2020 14:52. The process is available again. The emergency procedure is not or no longer applicable
-
Scan in Rotterdam availability is limited
28-09-2020 -The availability of the process Scan in Rotterdam is limited from Monday 28-09-2020 12:43. The scan on the DELTA container terminal is available again. The emergency procedure no longer applies to this scan. The following...
-
Scan in Rotterdam availability is limited
28-09-2020 -The availability of the process Scan in Rotterdam is limited from Monday 28-09-2020 12:01. The scan on the container terminal APMT2 is available again. The emergency procedure no longer applies to this scan. The following...
-
Scan in Rotterdam availability is limited
28-09-2020 -The availability of the process Scan in Rotterdam is limited from Monday 28-09-2020 11:57. The scan on the container terminal APMT2 is available again. The emergency procedure no longer applies to this scan. The following...
-
Scan in Rotterdam availability is limited
28-09-2020 -The availability of the process Scan in Rotterdam is limited from Monday 28-09-2020 11:07. The following scans are currently unavailable: - APMT2 - RELO - DELTA The replacement scan is the mobix scan located at...
-
Transport (NCTS) availability is limited
28-09-2020 -The availability of the process Transport (NCTS) is limited from Sunday 27-09-2020 21:25. UPDATE: Yesterday it was reported that there are problems with documents from different Member States. This problem is still present. This means...
-
Scan in Rotterdam availability is limited
28-09-2020 -The availability of the process Scan in Rotterdam is limited from Monday 28-09-2020 08:45. Scanner at location APTM2 or RWG temporarily unavailable. "The scan at the APMT2 container terminal is temporarily unavailable. The replacement scan...
-
Transport (NCTS) availability is limited
27-09-2020 -The availability of the process Transport (NCTS) is limited from Sunday 27-09-2020 21:25. Messages from certain Member States are not currently processed. This concerns documents from Luxembourg, Belgium and Germany. For example, arrival reports that...
-
Scheduled maintenance Import to EU, Export from EU and Storage (AGS)
24-09-2020 -Required maintenance on Government systems will be performed from Sunday 11-10-2020 08:00 until (expected end-time) Sunday 11-10-2020 12:00. As a result the following Dutch Custom mainprocess(es) are unavailable: Import to EU, Export from EU and...
-
Scheduled maintenance Import to EU, Export from EU and Storage (AGS)
24-09-2020 -Required maintenance on Government systems will be performed from Tuesday 06-10-2020 12:00 until (expected end-time) Tuesday 06-10-2020 13:00. As a result the following Dutch Custom mainprocess(es) are unavailable: Import to EU, Export from EU and...
-
Scan in Rotterdam is available (again)
24-09-2020 -The process Scan in Rotterdam is available (again) from Thursday 24-09-2020 09:37. The process is available again. The scan at the container terminal RWG is available again. You can no longer use the emergency procedure...
-
Scan in Rotterdam availability is limited
24-09-2020 -The availability of the process Scan in Rotterdam is limited from Thursday 24-09-2020 08:45. The scan on the container terminal RWG is temporarily unavailable. The replacement scan is the HICO scan located at Bosporusstraat 5,...
-
Transport of excisable goods (EMCS) is available (again)
23-09-2020 -The process Transport of excisable goods (EMCS) is available (again) from Wednesday 23-09-2020 14:34. The process is available again. The emergency procedure is not or no longer applicable
-
Exit from the EU (Single Window) is available (again)
23-09-2020 -The process Exit from the EU (Single Window) is available (again) from Wednesday 23-09-2020 14:34. The process is available again. The emergency procedure is not or no longer applicable
-
Import to EU, Export from EU and Storage (AGS) is available (again)
23-09-2020 -The process Import to EU, Export from EU and Storage (AGS) is available (again) from Wednesday 23-09-2020 14:34. The process is available again. The emergency procedure is not or no longer applicable
-
Entry of goods to the EU (Single Window) is available (again)
23-09-2020 -The process Entry of goods to the EU (Single Window) is available (again) from Wednesday 23-09-2020 14:34. The process is available again. The emergency procedure is not or no longer applicable
-
Transport of excisable goods (EMCS) availability is limited
23-09-2020 -The availability of the process Transport of excisable goods (EMCS) is limited from Wednesday 23-09-2020 14:02. You are allowed to use the fall-back procedure. However: it is our advice to use the mentioned procedure only...
-
Exit from the EU (Single Window) availability is limited
23-09-2020 -The availability of the process Exit from the EU (Single Window) is limited from Wednesday 23-09-2020 14:02. You are allowed to use the fall-back procedure. However: it is our advice to use the mentioned procedure...
-
Import to EU, Export from EU and Storage (AGS) availability is limited
23-09-2020 -The availability of the process Import to EU, Export from EU and Storage (AGS) is limited from Wednesday 23-09-2020 14:02. You are allowed to use the fall-back procedure. However: it is our advice to use...
-
Entry of goods to the EU (Single Window) availability is limited
23-09-2020 -The availability of the process Entry of goods to the EU (Single Window) is limited from Wednesday 23-09-2020 14:02. You are allowed to use the fall-back procedure. However: it is our advice to use the...
-
Transport of excisable goods (EMCS) availability is limited
23-09-2020 -The availability of the process Transport of excisable goods (EMCS) is limited from Wednesday 23-09-2020 13:52. You are allowed to use the fall-back procedure. However: it is our advice to use the mentioned procedure only...
-
Import to EU, Export from EU and Storage (AGS) availability is limited
23-09-2020 -The availability of the process Import to EU, Export from EU and Storage (AGS) is limited from Wednesday 23-09-2020 13:52. You are allowed to use the fall-back procedure. However: it is our advice to use...
-
Import to EU, Export from EU and Storage (AGS) availability is under investigation
23-09-2020 -The availability of the process Import to EU, Export from EU and Storage (AGS) is under investigation from Wednesday 23-09-2020 13:43. Signals about a possible disruption have been received.
-
Import to EU, Export from EU and Storage (AGS) is available (again)
23-09-2020 -The process Import to EU, Export from EU and Storage (AGS) is available (again) from Wednesday 23-09-2020 13:24. Maintenance has been completed. The emergency procedure is not or no longer applicable
-
Transport of excisable goods (EMCS) availability is under investigation
23-09-2020 -The availability of the process Transport of excisable goods (EMCS) is under investigation from Wednesday 23-09-2020 13:19. Signals about a possible disruption have been received.