Go directly to content Go directly to footer

(UPDATE) Scheduled maintenance Transport (NCTS)

Expected rollout end time is 12 noon instead of 11 a.m.

Previous message:

———————–

Required maintenance on Government systems will be performed from Sunday 16-10-2022 08:00 until (expected end-time) Sunday 16-10-2022 11:00.
As a result the following Dutch Custom mainprocess(es) are unavailable:

  • Transport (NCTS)

Scheduled maintenance: You can deliver messages as usual, these will not be processed but buffered during the maintenance. After completion of the maintenance, the messages will still be processed and possible return messages will follow.

You are allowed to use the fall-back procedure. However: it is our advice to use the mentioned procedure only if, to your opinion, the logistic process needs treatment of declarations.

You will be informed about the availability of the involved process(es).

Share this page